Should I have the septic system inspected? Why an inspection? The purpose of an inspection is to evaluate the present and future performance of an existing onsite sewage treatment system. It is likely that an inspection cannot show the true present condition of all parts of the system. The inspection certificate might state that the onsite sewage treatment system has been inspected and found to be in satisfactory working condition and apparently not in violation of any local sanitary codes. The definition of satisfactory working condition must be clearly defined and understood by all concerned parties. The provisions of the local sanitary code must be thoroughly known by the inspector. The toilets may flush, all the drains may work with no back up, but the inside-the-house conditions say little about the condition of the onsite sewage treatment system. There may be no evidence of sewage surfacing in the area of the drainfield, but this doesn't mean that the drainfield is not full and at maximum capacity. A greater daily water use may cause a sewage back up or surfacing on the lawn. The fact that the septic system appears to be in working condition at the present time is definitely not a warranty or guarantee that the system will continue to function properly for any given period of time in the future. This point must be carefully and fully explained to all interested parties. The average daily capacity of the system has been established by previous construction procedures and previous maintenance of the septic system. The average daily water use and future maintenance cannot be controlled by the person who inspects and issues a certificate of inspection of the system. Inspection is for whom? There are a number of parties vitally interested in the results of an inspection of the onsite sewage treatment system. They are the buyer, the seller, the real estate agent, the lending agency, and the local unit of government. They all have slightly different interests. The seller wants a clean bill of health for the sewage treatment system since "We never had a problem with it!" The prospective buyer wants the house but "Never wants to have a problem with the sewage system!" The lender wants the deal to go through as quickly and as smoothly as possible with no future problems. The real estate agent is interested in a commission as soon as possible. The local unit of government wants to know if the onsite system is up to the current standards and is not a public nuisance or health hazard. The inspector must prepare a report that will provide some answer to all the questions that might be raised. An educational program about the operation of an onsite sewage treatment system along with inspection procedures and results is clearly needed. Some of the interested parties likely are not familiar with the operation and maintenance of an onsite sewage treatment system. The prospective owner certainly should be. And if the system doesn't work, that education will begin in a hurry. "Bury it and forget it" is unfortunately too common a practice with onsite sewage treatment systems. The onsite professional should know that without frequent cleaning of the septic tank, solids will wash out of the tank into the drainfield. The amount of solids in the drainfield may range from negligible to nearly full. Certainly a drainfield with only a few solids will perform better and longer than a drainfield that is nearly full of solids. "The toilet still flushes good!" is a common evaluation of the onsite sewage treatment system. But, the prospective buyer wants to know for how long and the inspector is expected to provide that information. Can any drainfield handle any amount of waste water that may be discharged into it? Absolutely not! Every soil absorption system has a maximum capacity, which when exceeded will result in a problem. Sewage will either back up in the basement or surface at the soil absorption unit. Which one happens depends on the relative elevation of the house and the drainfield. What was the estimated water use of the present owners? What is the estimated water use of the prospective purchasers? What will happen to the system if the water use increases by double or more? Seller, buyer, lender, and agent had all better be well informed on what the amount of waste water means to the operation of an onsite sewage treatment system. It is the inspector's duty to clearly inform them, preferably in writing, so there is less chance of a misunderstanding. Some questions that may need answers are:
The projected performance of the onsite system could be related to this water use. If the buyer is not willing to be restricted to such use, other provisions will need to be made. As an example, let's say that two people have occupied the house now up for sale for 15 years. The onsite system is likely treating at least 150 gallons per day. The septic tank has been cleaned regularly and the present occupants have never had any sewage back up or surfacing. The buyers are a family of six — mom and dad, and four teenagers. The odds are very good that this family will use considerably more water than 150 gallons per day.
Serious questions that need to be answered to predict the capacity and life of an onsite sewage treatment system are:
General information needed [by the buyer & inspector]:
See Also: Get To Know Your Septic Tank Should I have the septic system inspected? Care And Feeding Of Your Septic Tank How often should I have my septic system pumped? Aerobic Onsite Water Treatment Systems Septic And Sewage Tips Links to Related Websites: Sewer Systems - From the How Stuff Works series
|
||||||||||
| |||||||||||